Opens in a new tab
|
03338 – 70 856 16
Installation

Installing Artificial Grass: A Step-by-Step Guide from the Pros

Installing artificial grass in 10 steps: from the layout plan and base layer to invisible seams – with a materials list, special cases for patios and balconies, and the most common mistakes.

Patrick Jonas
Managing Director · Landscape Gardener
Published: Updated:

In short

Artificial grass is installed in five phases: measuring and planning the area, removing the old ground, creating a compacted base of crushed stone and chippings, rolling out the weed membrane, and finally cutting, joining, and securing the artificial grass. For 30–50 m², experienced DIYers usually need one to two weekends – most of the work goes into the base layer.

Artificial grass is only as good as its installation. Waves, visible seams, or puddles almost always have the same cause: a base layer that isn’t level, stable, or permeable enough. In this guide, we’ll show you step by step how to properly install artificial grass in your garden – and what matters on patios, balconies, or concrete. These tips come from over 25 years of hands-on installation experience from our team.

Tools and Materials: What You’ll Need

MaterialTool
Artificial grass (sold by the roll, usually 2 m or 4 m wide)Spade, shovel, wheelbarrow
Crushed stone (e.g., 0/32 grain size) for the base layerPlate compactor (can be rented from a hardware store)
Chippings or crushed sand (e.g., 0/5) as a leveling layerStraightedge, spirit level, rake
Weed membrane (geotextile)Utility knife with spare blades
Seam tape and artificial grass adhesiveTape measure, string, chalk
Edging (lawn edging, curb stones, etc.)Rubber mallet, caulking gun
Ground pegs/artificial grass nails, silica sand if neededStiff broom or artificial grass brush
Typical materials and tools list for garden installation

Step 1: Measure the Area and Create a Layout Plan

Measure the area precisely and sketch it on paper. Plan the strips so that as few seams as possible are created and all strips face the same pile direction. The blades should ideally point toward the main viewing point – such as the patio – so the lawn looks its fullest.

  • Allow for 5–10% waste, more for irregularly shaped areas.
  • Artificial grass is usually supplied in roll widths of 2 m or 4 m. Choose the width that best suits your area.
  • Avoid placing seams in main walking paths whenever possible.

Step 2: Remove the Old Ground

Remove old lawn, roots, and stones. For a garden base layer, excavation is typically about 8–12 cm deep – depending on soil stability and intended use. For clay-heavy, poorly draining soils, you may need to go deeper.

Practical Tip from TOP GREEN

Plan for a slight slope away from the house wall from the outset. This way, rainwater can drain safely even during heavy rain – even if the artificial grass itself is permeable.

Step 3: Install the Edging

The edging holds the base layer in shape and gives the artificial grass a clean finish. Install lawn edging made of metal or plastic, curb stones, or palisades before laying the base layer – this allows the crushed stone to be compacted cleanly right up to the edge.

Step 4: Install and Compact the Crushed Stone Base Layer

The base layer is the foundation of your artificial grass. Apply crushed stone to a thickness of about 5–8 cm and compact it in layers using the plate compactor. A well-compacted base layer prevents dents later on and ensures proper drainage.

Step 5: Level the Leveling Layer

A thin leveling layer of chippings or crushed sand, about 2–3 cm thick, goes on top of the base layer. Level it precisely using a straightedge and spirit level, then compact it lightly once more. Any unevenness overlooked now will show through the artificial grass later.

You can read more about the structure in our glossary under Base Layer.

Step 6: Lay Out the Weed Membrane

Roll out the weed membrane over the entire area, overlapping the strips by about 10 cm. The membrane prevents weeds from growing through from below while remaining permeable to water.

Step 7: Roll Out, Let Acclimate, and Cut the Artificial Grass

Roll out the artificial grass and, if possible, let it sit in the sun for a few hours. This relaxes the backing fabric, smooths out roll creases, and makes the material easier to fit.

  • Always cut from the back between the rows of stitching – this way you won’t damage any blades.
  • Change blades frequently: dull blades tear the backing.
  • Cut edges a bit more generously at first, then trim to an exact fit at the end.

Step 8: Join the Seams

Place two strips edge to edge – without gaps or overlap. Fold back the edges, position the seam tape centered beneath the seam, and apply the artificial grass adhesive. Then fold both strips onto the adhesive bed, press firmly, and allow to cure. Important: all strips must have the same pile direction, otherwise the seam will be immediately visible.

Step 9: Secure the Edges

At the edges, the artificial grass is secured with ground pegs or artificial grass nails spaced about 20–30 cm apart, or glued to the edging. Smooth the blades over the nail heads with your fingers so they remain hidden.

Step 10: Brush In and – If Required – Add Sand Infill

Finally, brush the blades against the grain so they stand upright. Whether silica sand is added as an infill depends on the product: many modern garden lawns require little to no sand at all. Follow the manufacturer’s instructions here.

Special Cases: Patios, Balconies, and Concrete

On solid surfaces, the crushed stone base layer is not needed. What matters here is that water can drain away.

SurfaceWhat to Consider
Concrete and ScreedCheck the slope, add a drainage mat if needed; glue the artificial grass down or lay it loose and secure the edges.
Pavers and TilesBridge joints and uneven spots with a leveling mat so they don’t show through.
Balcony (Rental Apartment)Lay loose instead of gluing, keep drains clear, and follow the property management’s weight and fire safety requirements.
Roof TerraceNever damage the waterproofing with nails or anchors; account for drainage and wind uplift.

The Most Common Mistakes When Installing Artificial Grass

MistakeConsequenceHow to Avoid It
Base layer not compactedDents and depressions after a few monthsCompact in layers using a plate compactor
Pile direction mixed upStrips appear different shades, seams visibleAlign all strips before cutting
No slope, no drainagePuddles, moss, odorsPlan for a slope, choose a permeable base layer
Forgot the weed membraneWeeds grow through the drainage holesLay the membrane across the entire area with overlap
Too little adhesive at the seamsSeams open up with temperature changesApply adhesive evenly, press strips down firmly

DIY Installation or Professional Installation?

Small, level areas on balconies or patios can be installed well on your own. For garden areas requiring a base layer, hiring a professional company is usually worthwhile: the groundwork is physically demanding, machinery needs to be rented, and mistakes in the base layer can only be corrected later with considerable effort.

DIY InstallationProfessional Installation
Costmaterials and machine rental onlymaterials plus labor
Time Requiredoften several weekendsusually a few days
Resultdepends on experience and toolslevel base layer, invisible seams
Warrantymaterials onlymaterials and installation

Our Offer

As an official Royal Grass® partner, we handle planning, base layer, and installation – nationwide. Learn more about artificial grass installation or compare varieties in advance at our show garden.

Frequently Asked Questions About Installing Artificial Grass

How deep do you need to excavate for artificial grass?

For a garden base layer, excavation is typically about 8 to 12 cm. On top of this comes a compacted crushed stone base layer of about 5 to 8 cm and a leveling layer of chippings or crushed sand of about 2 to 3 cm.

Can artificial grass be laid directly on soil?

We advise against this. Without a compacted base layer, dents quickly form, water pools, and weeds grow through. A base layer of crushed stone and chippings should always be laid on soil or old lawn.

Does artificial grass need a weed membrane?

Yes, when installing on a soil or crushed stone base, a weed membrane is advisable. It prevents weeds from growing up through the drainage holes while still allowing water to pass through.

Which direction should artificial grass be laid in?

All strips must have the same pile direction. The lawn looks most natural when the blades point toward the main viewing point, such as the patio or living room window.

How long does it take to install artificial grass?

A professional company typically installs a standard 50 to 100 m² garden, including the base layer, in just a few days. If doing it yourself, you should plan for several weekends for the same area.

Matching Service

Royal Grass® Artificial Turf from the Official Partner

Consultation, planning, and professional installation all from one source – with a 15-year warranty on the material.

Patrick Jonas, Managing Director of TOP GREEN
About the Author

Patrick Jonas

Managing Director of TOP GREEN · Landscape Gardener

Patrick Jonas is a trained landscape gardener and has been running the family business TOP GREEN since 2021. Before that, he was responsible for planning and implementing projects for many years – from private gardens to sports facilities and major events in Berlin.

More About TOP GREEN
Contents
Free Consultation

Questions About Your Project?

We'll be happy to advise you in person – on-site, at our showroom garden, or via video call.

Request a Consultation

Let's discuss your project.

Free & No-Obligation Initial Consultation

Personalized consultation — on-site or via video call.

Free Initial Consultation

Let's discuss your project.

On-site or via video call. We will respond within one business day – with a specific answer, not just a brochure.

Data Protection