{"id":3304,"date":"2026-10-16T09:35:30","date_gmt":"2026-10-16T07:35:30","guid":{"rendered":"http:\/\/staging.topgreen.de\/ratgeber\/artificial-grass-sub-base-how-to-properly-prepare-the-foundation\/"},"modified":"2026-10-26T12:48:47","modified_gmt":"2026-10-26T11:48:47","slug":"artificial-grass-sub-base-how-to-properly-prepare-the-foundation","status":"publish","type":"post","link":"https:\/\/topgreen.de\/en\/ratgeber\/artificial-grass-sub-base-how-to-properly-prepare-the-foundation\/","title":{"rendered":"Artificial Grass Sub-base: How to Properly Prepare the Foundation"},"content":{"rendered":"\n<div class=\"wp-block-group tg-box tg-box--answer\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"tg-box__title wp-block-paragraph\">In brief<\/p>\n\n\n<p class=\"wp-block-paragraph\">On soil or old lawns, artificial grass requires a <strong>compacted, water-permeable foundation<\/strong>: approximately 8\u201312 cm of excavation, a <strong>gravel base layer<\/strong> of 5\u20138 cm, a 2\u20133 cm <strong>leveling layer<\/strong> made of grit or crushed sand, and a <strong>weed membrane<\/strong>. On solid surfaces such as concrete, pavement, or tiles, the gravel is not required \u2013 here, the <strong>slope<\/strong> and a <strong>drainage or leveling mat<\/strong> are crucial. <\/p>\n<\/div><\/div>\n\n<p class=\"wp-block-paragraph\">The sub-base is the foundation of every artificial grass surface. Mistakes made here can hardly be corrected later: dents, ripples, puddles, and weeds almost always originate in the foundation. We show you which structure is right for which sub-base and how to calculate material quantities.  <\/p>\n\n<h2 class=\"wp-block-heading\">Which sub-base requires which structure?<\/h2>\n\n<figure class=\"wp-block-table tg-table\"><table><thead><tr><th>Sub-base<\/th><th>Structure<\/th><th>Important<\/th><\/tr><\/thead><tbody><tr><td>Soil, old lawn<\/td><td>Excavation, gravel base layer, leveling layer, weed membrane<\/td><td>Compaction and slope<\/td><\/tr><tr><td>Concrete, screed<\/td><td>Drainage or leveling mat if necessary, artificial grass<\/td><td>Water drainage, check for cracks<\/td><\/tr><tr><td>Pavement<\/td><td>Leveling mat, artificial grass<\/td><td>Joints must not show through<\/td><\/tr><tr><td>Tiles, terrace<\/td><td>Drainage mat, artificial grass (loose or glued)<\/td><td>Slope towards the drain<\/td><\/tr><tr><td>Balcony, roof terrace<\/td><td>Drainage mat, artificial grass (loose-laid)<\/td><td>Protect waterproofing, weight, wind suction<\/td><\/tr><tr><td>Wooden deck<\/td><td>Only after inspection, with rear ventilation<\/td><td>Moisture can damage wood<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<h2 class=\"wp-block-heading\">The classic foundation in the garden<\/h2>\n\n<p class=\"wp-block-paragraph\">On soil, a professional foundation consists of several layers:<\/p>\n\n<figure class=\"wp-block-table tg-table\"><table><thead><tr><th>Layer<\/th><th>Material<\/th><th>Thickness (guide value)<\/th><\/tr><\/thead><tbody><tr><td>Artificial grass<\/td><td>e.g., Royal Grass\u00ae<\/td><td>\u2013<\/td><\/tr><tr><td><a href=\"https:\/\/topgreen.de\/lexikon\/unkrautvlies\/\">Weed membrane<\/a><\/td><td>water-permeable geotextile<\/td><td>\u2013<\/td><\/tr><tr><td>Leveling layer<\/td><td><a href=\"https:\/\/topgreen.de\/lexikon\/brechsand\/\">Crushed sand<\/a> or <a href=\"https:\/\/topgreen.de\/lexikon\/edelsplitt\/\">high-grade grit<\/a>, e.g., 0\/5 or 2\/5<\/td><td>approx. 2\u20133 cm<\/td><\/tr><tr><td><a href=\"https:\/\/topgreen.de\/lexikon\/schottertragschicht\/\">Base layer<\/a><\/td><td>Gravel, e.g., 0\/32<\/td><td>approx. 5\u20138 cm<\/td><\/tr><tr><td>Subgrade<\/td><td>natural, compacted soil<\/td><td>\u2013<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Typical structure for private gardens; the base layer is reinforced for poorly load-bearing or loamy soils<\/figcaption><\/figure>\n\n<h3 class=\"wp-block-heading\">Step by step<\/h3>\n\n<ol class=\"wp-block-list\">\n<li><strong>Excavation:<\/strong> Remove lawn, roots, and topsoil to a depth of approx. 8\u201312 cm \u2013 see <a href=\"https:\/\/topgreen.de\/lexikon\/aushub\/\">excavation<\/a>.<\/li>\n\n<li><strong>Compact the subgrade:<\/strong> Level the exposed soil and compact it with a <a href=\"https:\/\/topgreen.de\/lexikon\/ruettelplatte\/\">vibratory plate compactor<\/a>.<\/li>\n\n<li><strong>Install edging:<\/strong> Install lawn edges or border stones before the gravel.<\/li>\n\n<li><strong>Install base layer:<\/strong> Apply gravel in layers and compact it.<\/li>\n\n<li><strong>Screed the leveling layer:<\/strong> Level precisely with a straightedge, plan for a slight <a href=\"https:\/\/topgreen.de\/lexikon\/gefaelle\/\">slope<\/a>, and re-compact.<\/li>\n\n<li><strong>Lay weed membrane:<\/strong> with approx. 10 cm overlap.<\/li>\n<\/ol>\n\n<h2 class=\"wp-block-heading\">Calculate material requirements<\/h2>\n\n<p class=\"wp-block-paragraph\">For an initial estimate, multiply the area by the layer thickness. Example for 50 m\u00b2: <\/p>\n\n<figure class=\"wp-block-table tg-table\"><table><thead><tr><th>Layer<\/th><th>Calculation<\/th><th>Volume<\/th><\/tr><\/thead><tbody><tr><td>Excavation (10 cm)<\/td><td>50 m\u00b2 \u00d7 0.10 m<\/td><td>5.0 m\u00b3<\/td><\/tr><tr><td>Gravel (6 cm)<\/td><td>50 m\u00b2 \u00d7 0.06 m<\/td><td>3.0 m\u00b3 (compacted)<\/td><\/tr><tr><td>Crushed sand\/grit (2.5 cm)<\/td><td>50 m\u00b2 \u00d7 0.025 m<\/td><td>1.25 m\u00b3 (compacted)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<p class=\"wp-block-paragraph\">Since loose material settles during compaction, a surcharge is included when ordering. Your building material supplier will provide the appropriate values for the respective material. <\/p>\n\n<h2 class=\"wp-block-heading\">Artificial grass on concrete, pavement, and tiles<\/h2>\n\n<p class=\"wp-block-paragraph\">Solid surfaces are already load-bearing but do not drain water downwards. Therefore: <\/p>\n\n<ul class=\"wp-block-list\">\n<li>Check the slope \u2013 water must be able to flow to the edge or drain<\/li>\n\n<li>A <a href=\"https:\/\/topgreen.de\/lexikon\/drainagematte\/\">drainage mat<\/a> creates space for water runoff and levels out small unevenness<\/li>\n\n<li>Bridge joints and edges in pavement with a leveling mat<\/li>\n\n<li>On roof terraces, never damage the waterproofing and consider <a href=\"https:\/\/topgreen.de\/lexikon\/windsog\/\">wind suction<\/a><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\">The most common foundation mistakes<\/h2>\n\n<figure class=\"wp-block-table tg-table\"><table><thead><tr><th>Mistake<\/th><th>Consequence<\/th><\/tr><\/thead><tbody><tr><td>Insufficiently compacted<\/td><td>Dents and hollows after a few months<\/td><\/tr><tr><td>Leveling layer too thick<\/td><td>Material shifts, surface becomes uneven<\/td><\/tr><tr><td>No slope<\/td><td>Puddles, moss, odors<\/td><\/tr><tr><td>Wrong material, e.g., rounded gravel<\/td><td>Hardly possible to compact<\/td><\/tr><tr><td>Forgot weed membrane<\/td><td>Weeds grow through from below<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<div class=\"wp-block-group tg-box tg-box--tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"tg-box__title wp-block-paragraph\">Our offer<\/p>\n\n\n<p class=\"wp-block-paragraph\">We inspect your sub-base on-site and handle the foundation and installation from a single source \u2013 nationwide. <a href=\"https:\/\/topgreen.de\/en\/services\/royal-grass-artificial-turf\/\">More about artificial grass installation<\/a>. To see what happens next, view our <a href=\"https:\/\/topgreen.de\/en\/ratgeber\/installing-artificial-grass-a-step-by-step-guide-from-the-pros\/\">step-by-step guide<\/a>. <\/p>\n<\/div><\/div>\n\n<h2 class=\"wp-block-heading\">Frequently asked questions about artificial grass sub-bases<\/h2>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Which sub-base is best for artificial grass?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>In the garden, a compacted foundation made of gravel and a leveling layer of crushed sand or grit with a weed membrane is best. On solid surfaces like concrete or tiles, a drainage mat is suitable, provided there is a sufficient slope. <\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">How thick should the foundation for artificial grass be?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>In private gardens, approximately 5 to 8 centimeters of compacted gravel and 2 to 3 centimeters of leveling layer are typical. For poor soil or higher loads, the base layer is reinforced. <\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Can artificial grass be laid on sand?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Pure sand as the only layer is not sufficiently load-bearing and will shift. Crushed sand or high-grade grit are better suited as a thin leveling layer on a compacted gravel base layer. <\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Can artificial grass be laid directly on pavement?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Yes, this is possible on level pavement with a slope. To prevent joints and edges from showing through and to allow water to drain, a leveling or drainage mat is recommended underneath. <\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Which sub-base for artificial grass? Installation on soil, concrete, pavement, tiles, and balconies \u2013 including layer structure, material calculator, and the most common foundation mistakes. <\/p>\n","protected":false},"author":2,"featured_media":2991,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[73],"tags":[],"class_list":["post-3304","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-installation"],"acf":[],"_links":{"self":[{"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/posts\/3304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/comments?post=3304"}],"version-history":[{"count":3,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/posts\/3304\/revisions"}],"predecessor-version":[{"id":3375,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/posts\/3304\/revisions\/3375"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/media\/2991"}],"wp:attachment":[{"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/media?parent=3304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/categories?post=3304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/topgreen.de\/en\/wp-json\/wp\/v2\/tags?post=3304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}